Exciting news!! We have begun the final stage of the reconstruction of the SEED School: plastering and painting the inner and outer walls. This is essential to prevent erosion of the walls, currently being held in place temporarily by wooden beams and metal sheets.
Starting in 2019, a reconstruction of the SEED School was deemed necessary to maintain the school’s structural integrity and longevity, as it’s previous metal sheet walls and weak foundation were deteriorating. Thus far, the new floors, walls, roof and windows have been completed, with a third floor added to accommodate grade 5 & 6 classes.
Lorries of sand being unloaded at the school.